Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Merge jdk8u:master #8

Merged
merged 5 commits into from
Jan 10, 2023
Merged

Merge jdk8u:master #8

merged 5 commits into from
Jan 10, 2023

Conversation

gnu-andrew
Copy link
Member

@gnu-andrew gnu-andrew commented Dec 16, 2022

Mere jdk8u332-b03


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change must be properly reviewed (1 review required, with at least 1 Committer)

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/shenandoah-jdk8u pull/8/head:pull/8
$ git checkout pull/8

Update a local copy of the PR:
$ git checkout pull/8
$ git pull https://git.openjdk.org/shenandoah-jdk8u pull/8/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 8

View PR using the GUI difftool:
$ git pr show -t 8

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/shenandoah-jdk8u/pull/8.diff

Sorry, something went wrong.

@bridgekeeper
Copy link

bridgekeeper bot commented Dec 16, 2022

👋 Welcome back andrew! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Dec 16, 2022

@gnu-andrew This change now passes all automated pre-integration checks.

After integration, the commit message for the final commit will be:

Merge jdk8u:master

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated rfr Pull request is ready for review labels Dec 16, 2022
@irisclark irisclark merged commit 207cbfb into openjdk:master Jan 10, 2023
@mlbridge
Copy link

mlbridge bot commented Jan 10, 2023

Webrevs

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
ready Pull request is ready to be integrated rfr Pull request is ready for review
Development

Successfully merging this pull request may close these issues.

None yet

4 participants